an image of project orion 25

Orion 25

Managed by JRP Eco Solutions

100% Reserved

Credits Generated

₹0

Energy Produced

0 kWh

some image in a carousel

Secured Generation is enabled for this project.  Learn More

About the Project

Orion•25 is the first 10-year project rolling out as Digital Solar, where the shorter tenure is balanced with a higher credit yield ratio, ensuring optimal bill savings. The 25 kW solar plant with bifacial modules is installed on Kulaswamini Heights' rooftops in Thane. It powers the residential complex’s common area meters and is the third Digital Solar project for JRP Enterprise, Waaree’s official developer in Mumbai.

Every unit (kWh) from this project discounts ₹6.71 off your power bill

Overview

Capacity

25.13 KW

Reservation Status

100% Reserved

Operational Since

Feb 2025

Annualised Savings

11.5%

A badge with a check mark

New project coming soon!

Know more about Projects

Why do factors such as tenure or credit rate differ between projects?
Do I need to be in the same location as the project to reserve from it?
How much solar can I reserve?
How long can I reserve solar for?
What is the validity of my credits?
Are my monthly credits constant?

Got questions? Check our ChatGPT guide

BETA

A cleaner grid for our future, built together by all of us